ZEYT 300m3/day Water Treatment Plant BUİLDİNG CONSTRUCTİON
ZEYT 300m3/day Water Treatment Plant
Construction work of treating the water taken from the Ceyhun river at a distance of 100m as drinking water with a capacity of 300m3/day.
Construction work of treating the water taken from the Ceyhun river at a distance of 100m as drinking water with a capacity of 300m3/day.