UF PlantforBottlingPlantin Iraq ELECTRICAL-MECHANİCAL-PROCESS
UF PlantforBottlingPlantin Iraq
• Location:
Dohuk / Iraq
• Source:
Well Water
• Total Flow
: 200 m3/h
• Project
Year : 2013
As raw water
source contained Turbity and Microorganisms, Ultrafiltration Plant were
installed in Customer’s Bottling Facility.
Bottled Water has been sold since 2013 and has been
drunk by Iraq peoples in healthy way