BWRO plantsin Manisa / Turkey ELECTRICAL-MECHANİCAL-PROCESS
BWRO plantsin Manisa / Turkey
• Location:
Manisa/ Turkey
• Source:
Well Water
• Total Flow
: 100 m3/h
• Project
Year : 2018
BWRO system was already installed in Thermal Power
Plant for obtaining water conductivity less than 5 microsiemens /cm for boiler
of customer in Turkey. Treatment system contains disinfection filtration
reverse osmosis system regarding to their permeate Water requirement.